Srithai Superware Manufacturing India Ltd
- Client:
- Srithai Superware Manufacturing India Ltd
- Location:
- Sanand GIDC, Gujarat
- Area:
- 304080 Sqft
- Sector:
- Engineering Unit
- Year:
- 2014-2015

Design and Execution Approach
With a focus on efficiency, durability, and precision, the design and construction of this industrial unit were executed to meet international manufacturing standards. The project emphasized streamlined operations, structural integrity, and integrated utility systems to support high-performance production needs. Every phase-from ground development to final installation-was engineered for long-term functionality and low-maintenance operation.
Land Development & Earth Filling: Initial site preparation ensured structural stability and optimal foundation performance.
HVAC Systems: Installation of climate control systems for operational efficiency and workforce comfort.
PEB Structure: A pre-engineered building system provided rapid construction timelines, flexibility, and cost-efficiency.
Design Engineering & Liasoning: Compliance with local codes, environmental norms, and coordination with regulatory bodies.
Civil & Structural Work: Robust civil engineering with reinforced concrete foundations, flooring, and infrastructure.
Landscape Integration: Green buffers and site landscaping for environmental enhancement and site aesthetics.
Mechanical, Electrical & Plumbing (MEP): Full-service utilities, including compressed air lines, water supply, drainage, and industrial-grade electrification.
Functional Zones
While not residential, the facility layout was optimized for segmented functionality and workflow efficiency:
- Production Halls
- Mechanical Rooms
- Quality Control Labs
- Utility Blocks
- Administrative Offices
- Storage and Dispatch Zones